Inverter to Critical Loads Subpanel Wiring Diagram

Move your essential circuits to a subpanel that the inverter keeps powered when the grid goes down.

Inverter to Critical Loads SubpanelFeederBattery48VInverterPure sine, 6kWCritical LoadsSubpanelKitchen Outlets20ARefrigerator15ALighting15AFurnace Blower15AGround rodDC positive (+)DC negative (−)AC (hot/neutral)Equipment groundtheloadcalc.com
Simplified diagram. Ratings shown are examples; size components for your own system.Download PNG

Most home battery inverters cannot run an entire house, so the usual approach is a critical loads subpanel. The circuits that matter in an outage, such as the fridge, furnace, lights and a few outlets, move from the main panel into a subpanel fed by the inverter. When the grid fails, those circuits stay on.

Key takeaways

  • The inverter output feeds the subpanel through a feeder breaker sized to the inverter's output current.
  • Choose circuits whose combined running load fits the inverter's continuous rating.
  • In a subpanel, neutral and ground bars stay separate. Bond only at the service or source.
  • A licensed electrician and a permit are required in most places.

Components

ComponentTypical specRole
Inverter or hybrid inverterContinuous rating covers the critical loadsPowers the subpanel
Feeder breaker and wireSized to inverter output × 125%Protects the feeder
Critical loads subpanel8-16 spaces, separate neutral and ground barsDistributes backed-up circuits
Branch breakersMoved from the main panelProtect each circuit
Battery bankSized for outage durationEnergy storage

Step-by-step wiring

  1. 1List the circuits you need in an outage and add up their running and startup loads.
  2. 2Install the subpanel beside the main panel.
  3. 3Run the feeder from the inverter's backup/AC output to the subpanel main lugs or breaker.
  4. 4Move each critical circuit's breaker and conductors from the main panel to the subpanel.
  5. 5Keep neutrals on the isolated neutral bar and grounds on the ground bar.
  6. 6Test transfer by switching off grid power and confirming every critical circuit stays on.

Disconnect all sources before working, follow the equipment manuals and local electrical codes, and use a licensed electrician for work on home wiring and panels.

Choosing what goes in the subpanel

Good candidatesUsually leave out
Refrigerator and freezerCentral air conditioning
Furnace blower / boiler controlsElectric water heater
Lighting circuitsElectric range and dryer
Internet, a few outletsEV charger
Well or sump pump (if inverter allows)Space heaters

Size the feeder breaker to the inverter's continuous output current × 1.25. For example, a 6kW inverter at 240V outputs 25A, so a 30-35A feeder. Use the inverter sizing calculator for startup loads, and see the hybrid inverter diagram for how the subpanel fits a grid-tied battery system.

Common mistakes

  • Moving more circuits than the inverter can run at once.
  • Bonding neutral and ground in the subpanel.
  • Forgetting that motors (pumps, furnace) need startup surge capacity.
  • Splitting a multi-wire branch circuit between panels.

Frequently asked questions

What is a critical loads panel?

A subpanel containing only the circuits you want powered during an outage, fed by a battery inverter so it stays on when the grid fails.

How many circuits can go on a critical loads panel?

As many as the inverter can run simultaneously. Add up running watts and the largest startup surge, and compare with the inverter's ratings.

Why are neutral and ground separate in a subpanel?

So normal return current flows only on neutral conductors. Bonding them in more than one place puts current on ground wires and metal parts.